  Valentine Mill Pond was a popular destination for fishing and swimming from the turn of the century until the 1970s, when sediment problems made it impossible to enjoy the lake as before. Mechanical dredging deepened the lake and a sediment bypass system was designed and constructed to eliminate future sediment buildup. The sediment bypass system has effectively addressed the sedimentation problem, and the pond was removed from the state's 303(d) list in 2003.

 

Contact:

Mike Murphy
Middle Niobrara Natural 
  Resources District
402-376-3241

Paul Brakhage
(paul.brakhage@ndeq.state.ne.us)
NE Department of 
  Environmental Quality
402-471-4224


 
picture of dam

As part of the project, a unique labyrinth spillway was constructed to pass large storm event flows without manual operation. The hydrosuction system passes around the dam shown here.

 
picture of bridge crossing pond

The hydrosuction sediment removal system lies directly beneath the walkbridge shown here.

 
picture of Valentine Mill Pond

Valentine Mill Pond has been transformed from a mud hole to a popular recreation area.

 

Problem

Valentine Mill Pond was originally created in the 1890s by S.F. Gilman to power a gristmill. Since the 1970s the lake had shrunk from more than 30 acres to less than 15 acres. Exposed mud bars indicated the source of the problem—excessive sediment. A diagnostic feasibility study conducted by the Middle Niobrara Natural Resources District (NRD) indicated that the primary water quality concern was the amount of sand being deposited in the pond. Minnechaduza Creek, the pond's water source, was depositing as much as 60 tons of sediment into the lake daily. As a result of the feasibility study, Valentine Mill Pond was added to the Nebraska Department of Environmental Quality's (DEQ) section 303(d) list for impairment to aquatic life due to excessive sediment.

Top of page


Project Highlights

Mechanical dredging was necessary to remove sediment deposits and deepen the lake, but that alone would not solve the excessive sedimentation problems. To prevent excessive sedimentation from reoccurring, an innovative solution was needed. Rollin Hotchkiss, Ph.D., director of the Albrook Hydraulics Lab at Washington State University, joined the project team as a special consultant to Olsson Environmental Services. Dr. Hotchkiss, formerly with the University of Nebraska, had conducted research involving sediment bypass systems. To address the unique problems of Valentine Mill Pond, he designed a “hydrosuction sediment removal system” with a unique labyrinth spillway.

The system is designed to capture sediment as it enters the pond and to transport it via a pipeline around the dam to be discharged back into Minnechaduza Creek, without the use of external energy. “The system was also designed with the capability of collecting, through hydrosuction dredging, the sediment that was not captured by the bypass system,” said Daryoush Razavian of Olsson Environmental Services. “We believe that the sediment removal system implemented at the mill pond is the first system operating in the world capable of both bypassing and dredging sediment.”

Top of page


Results

The sediment removal system has effectively addressed the problem of excess sedimentation in Valentine Mill Pond. Ongoing monitoring, conducted by the Nebraska DEQ, has revealed significant water quality improvements, including reductions in phosphorus, nitrates, and total suspended solids. As a result of water quality improvements, Valentine Mill Pond was removed from the state's section 303(d) list in 2003. It now supports aquatic life, serves as an agricultural water supply, and offers aesthetic enjoyment.

Top of page


Partners and Funding

The Nebraska DEQ provided the initial funding for the NRD's diagnostic feasibility study. However, the project would not have been possible without the cooperation of the City of Valentine, Nebraska Public Power District, Cherry County, Nebraska Game and Parks Commission, Nebraska Environmental Trust, and Valentine Mill Pond landowners. The project cost a total of $1.6 million, including $155,000 of Clean Water Act section 319 funding.


Pre- and Post-Project Summer Conditions for Valentine Mill Pond


Parameter # of Samples Pre-Project
Median 1997-1999a
# of Samples Post-Project
Median
2003a
% Change
Conservation pool storage NA 76 acre-feet NA 162 acre-feet +113%
Total phosphorus 13 0.13 mg/L 4 0.07 mg/L -46%
Dissolved orthophosphorus 14 0.05 mg/L 5 0.02 mg/L -60%
Total suspended solids 14 31.0 mg/L 5 6.5 mg/L -79%
Water clarity 9 21 inches 5 57 inches +170%
Algae density 10 5.38 mg/m3 4 7.51 mg/m3 +40%
Nitrate nitrogen 14 0.45 mg/L 5 0.21 mg/L -54%
a Median not applicable to pool storage.