Jump to main content or area navigation.

Contact Us

Water: Nonpoint Source Success Stories

Oklahoma: Bird Creek

Agricultural Best Management Practice Implementation Decreases Turbidity in Creek

Waterbody Improved

High turbidity, due in part to practices associated with wheat and cattle production, resulted in impairment of Bird Creek and placement on Oklahoma's Clean Water Act (CWA) section 303(d) list in 2008. Implementation of best management practices (BMPs) to promote better quality grazing land and cropland decreased sediment loading into the creek. As a result, the entire length of 8-mile-long Bird Creek was removed from Oklahoma's 2012 CWA section 303(d) list for turbidity impairment. Bird Creek is now in partial attainment of its fish and wildlife propagation designated use.
Contact:

Shanon Phillips
(shanon.phillips@conservation.ok.gov)
Oklahoma Conservation
  Commission
405-522-4500


This map shows the location of the Bird Creek watershed within the state.

Figure 1. The Bird Creek watershed is in southeastern Oklahoma. (See larger map below.)


This photo shows a wide creek flowing through a forested riparian area.

Figure 3. Bird Creek is now in partial attainment of the fish and wildlife propagation designated use.


Problem

Bird Creek is an 8-mile-long stream in Choctaw County in southeastern Oklahoma (Figure 1). Land use in the 9,046-acre watershed is primarily wheat and pasture for cattle production, with some corn production as well. Poor grazing land and cropland management contributed to excess sedimentation in the watershed. In the 2008 water quality assessment, monitoring showed that 17 percent of Bird Creek's seasonal base flow water samples exceeded 50 nephelometric turbidity units (NTU). A stream is considered impaired by turbidity if more than 10 percent of the seasonal base flow water samples exceed 50 NTU (based on 5 years of data before the assessment year). On the basis of these assessment results, Oklahoma added the entire length of Bird Creek (OK410300010100_00) to the 2008 and subsequent CWA section 303(d) lists for nonattainment of the fish and wildlife propagation designated use due to turbidity impairment.  

Project Highlights

The Rotating Basin Monitoring Program is supported by EPA's CWA section 319 funds at an average annual cost of $1million. Monitoring costs include personnel, supplies, and lab analysis for 18 parameters from samples collected every 5 weeks at about 100 sites around the state, for a total of 20 episodes per 5-year cycle per basin. In-stream habitat, fish, and macroinvertebrate samples are also collected. Approximately $600,000 in EPA CWA section 319 supports statewide education, outreach, and monitoring efforts through the Blue Thumb program. The Oklahoma cost-share program provided $4,892 in state funding for BMPs in this watershed through the Kiamichi Conservation District. NRCS spent approximately $1.36 million for implementation of BMPs in Choctaw County from 2008 to 2011 through NRCS EQIP and general technical assistance funds. Landowners provided a significant percentage of funding toward BMP implementation in these programs as well.

Results

The Oklahoma Conservation Commission's Rotating Basin Monitoring Program, a statewide nonpoint source ambient monitoring program, documented improved water quality in Bird Creek due to landowners implementing BMPs. In the 2008 assessment, 17 percent of seasonal base flow water samples exceeded the turbidity criteria of 50 NTU. This exceedance was reduced to zero percent in 2012 (Figure 2). Hence, Bird Creek was removed from Oklahoma's CWA section 303(d) list for turbidity impairment in 2012 and is now in partial attainment of the fish and wildlife propagation designated use (Figure 3).

This scatterplot shows a 17 percent exceedance rate in 2008 and a 0 percent rate in 2012.

Figure 2. Monitoring data indicate that base flow turbidity levels in Bird Creek have declined.

Partners and Funding

The Rotating BasinMonitoring Program is supported by EPA's CWA section 319 funds at an averageannual cost of $1 million. Monitoring costs include personnel, supplies, andlab analysis for 18 parameters from samples collected every 5 weeks at about100 sites around the state, for a total of 20 episodes per 5-year cycle perbasin. In-stream habitat, fish, and macroinvertebrate samples are alsocollected. Approximately $600,000 in EPA CWA section 319 supports statewideeducation, outreach, and monitoring efforts through the Blue Thumb program. TheOklahoma cost-share program provided $4,892 in state funding for BMPs in thiswatershed through the Kiamichi Conservation District. NRCS spent approximately$1.36 million for implementation of BMPs in Choctaw County from 2008 to 2011through NRCS EQIP and general technical assistance funds. Landowners provided asignificant percentage of funding toward BMP implementation in these programsas well.

This map shows the location of the Bird Creek watershed within the state.

Figure 1. The Bird Creek watershed is in southeastern Oklahoma.

Top of page


Jump to main content.