Direct Channel Impacts
RRISSC Screening
Level Assessment
Steps 1. Land Use Activities
2. Hydro/Physio Inventory
3. Variables Influenced
4. Risk Rating System
5. Hillslope Processes
6. Mass Wasting
7. Roads
8. Surface Erosion
9. Hydrologic Processes
10. Flow Changes
11. Channel Processes
12. Stability Assessment
13. Streambank Erosion
14. In-channel Mining
15. Channel Impacts
16. Enlargement
17. Aggradation
18. Channel Evolution
19. Degradation
20. Sediment Risk Summary
21. Consequence Summary
22. Low Risk
23. Moderate Risk
24. High Risk
25. Mitigation
26. Monitoring
Go to PLA =>
The past activities of flood control, drainage improvement, emergency flood relief, vegetative conversions, straightening, levees, dredging, clearing vegetation, grubbing streamside zones, and other related "river engineering" works have caused major instability and sediment problems. This assessment addresses the potential risk of such works.