Water: Large Existing Power Plants

Phase II—Large existing electric generating plants, Economic and Benefits Analysis for the Proposed Section 316(b) Phase II Existing Facilities Rule

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


EPA-821-R-02-001; February 2002

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.

Download the complete Economic and Benefits Analysis for the Proposed Section 316(b) Phase II Existing Facilities Rule (PDF) (253 pp, 2.5MB).

Part A: Background Information

  • Chapter A1 Introduction and Overview
  • Chapter A2 Need for the Regulation
  • Chapter A3 Profile of the Electric Power Industry

Part B: Costs and Economic Impacts

  • Chapter B1 Summary of Compliance Costs
  • Chapter B2 Cost Impact Analysis
  • Chapter B3 Electricity Market Model Analysis
  • Chapter B4 Regulatory Flexibility Analysis
  • Chapter B5 UMRA Analysis
  • Chapter B6 Other Administrative Requirements
  • Chapter B7 Alternative Options - Costs and Economic Impacts
  • Chapter B8 Alternative Options - Electricity Market Model Analysis

Part C: National Benefits

  • Chapter C1 Case Study Introduction
  • Chapter C2 Summary of Case Study Results
  • Chapter C3 National Extrapolation of Baseline Loses
  • Chapter C4 Benefits

Part D: National Benefit-Cost Analysis

  • Chapter D1 Comparison of National Costs and Benefits