Jump to main content or area navigation.

Contact Us

Water: Large Existing Power Plants

Phase II—Large existing electric generating plants, Response to Public Comment: Regulations Addressing Cooling Water Intake Structures for Phase II Existing Facilities

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.

Please contact us for a section 508 accessible document.

This is an unofficial copy of the 316(b) Phase II Rule Comment Response Document. Transcription errors might have occurred when EPA converted this document into a readable electronic text file. The official version of this document is the paper copy in the public record for the Phase II Rule, which is available for review in the EPA Water Docket.

The official public docket is the collection of materials supporting EPA's decisions and is available for public viewing at the Water Docket in the EPA Docket Center (EPA/DC) in the basement of EPA West, Room B102, 1301 Constitution Ave., NW, Washington DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the Water Docket is (202) 566-2426. For access to the docket materials, please call ahead to schedule an appointment. A reasonable fee may be charged for photocopying.


Jump to main content.